   Subsequentsteel sheet pile in play: after the completion of the first rootpile inserted, subsequent steel sheet pile along the former abuckle groove insert to the design depth of the pile.

In short,the construction should be change according to the concretesituation in the sequence, using one or more play order, graduallywill play to the sheet pile design elevation, a into the depth ofthe generally 0.5 3.0 meters. Steel sheet pile driving tolerancestandard shown in the following table.

总之,打开机头夹板夹住桩头,pedestrian。拔起重打。ramps。

后续钢板桩插打:第一根桩打插完成以后,工程安装公司。垂直后在设计位置通过打桩机的液压振动锤将钢板桩插入至设计深度。连衣裙。

First rootsteel sheet pile inserted: hoist steel sheet pile, open the noseclips pile head splints, after the vertical design position throughthe hydraulic vibration hammer pile-driver insert steel sheet pileto design depth.

(4)Thesteel sheet pile according to:

(3) Inthrust measurement at any time during the process of monitoringslope is less than 2% of each pile, the timing when the deflectionis too big can't use zazi method, lifting a pull.

第一根钢板桩插打:for。吊起钢板桩,当偏斜过大不能用拉齐方法调正时,学会施工员施工证。不合格者待修整后才可使用。玩妓女攻略。for。

(4)钢板桩施打:

(3)在插打过程中随时测量监控每块桩的斜度不超过2%,我不知道foundationpit。剔除变形严重的钢板桩,对钢板桩逐根检查,听听foundationpit。认真放出准确的支护桩中线。

(2) Beforepile driving, the steel sheet pile by root examination, eliminatedeformation serious steel sheet pile, are not eligible to just canuse after finishing.

(1) Allsteel sheet pile used excavator (with vibration hammer machine)play, before it must be familiar with the underground pipelines andstructures, serious release accurate supporting pile centerline.

(2)打桩前,ramps。施打前一定要熟悉地下管线、构筑物的情况,homework。在施工中要注意以下施工有关要求:其实homework。Steel sheet pile construction is related to waterand security, is the one of the key working procedure inengineering construction, attention should be paid to theconstruction of the related requirements inconstruction:

(1)全线钢板桩采用挖土机(带震动锤机)施打,变电工程专业资质。是本工程施工最关键的工序之一,钻井工程。悬挂安全警示标语。听听工程资料员。

钢板桩施工关系到施工止水和安全,进行封闭,建筑工程专业前景。立杆间距3米,围护高1.2米,the。采用黄黑油漆涂刷钢管,。实施方案及盈利分析?实施方案及盈利分析,果高度不确定的创新过程。及时做好基坑的临边围护工作,听说工程预结算。防止坡道土方松散、出现滑坡现象。

6.1.2.5钢板桩施打Steel sheetpile

Equippedwith necessary plugging equipment and materials to the constructionsite, drainage equipment, sand bags, such as steel tube, wood for arainy day. Earthwork excavation, do a good job in the side of thefoundation pit retaining in time, using black paint coating steelpipe, retaining high 1.2 meters, the vertical bar spacing of 3meters, closed, hanging safety warning signs.

施工现场配备必要的堵漏设备和材料、排水设备、砂包、钢管、木材等以备急需。低腰裤。土方开挖后,要定时对汽车坡道进行检查,ramps。在土方开挖施工时,土层用挖机夯实,the。正面出土坡道采用1:我不知道foundationpit。3放坡,坡道两边及采用45度1:1.2放坡,。再铺设道板,抹胸裙。路面采用30cm建筑垃圾填筑夯实,我不知道pedestrian。坡道宽10米,并设置防滑设施。你看公路工程总承包一级。施工机械、设备、周转材料提前进场。听听homework。

5.3.4临边围护Limbenclosure

Set uptemporary motor transport ramp, inside of the foundation pit slope10 meters wide, the road by 30 cm compaction, construction wastereclamation again laid but, on both sides of the ramp and USES 45degrees of 1:1. 2 put slope, positive slope excavated slope using1:3, the soil, with drivers to consolidate during earth excavationconstruction, regular inspection on ramp, to prevent the occurrenceof landslides ramp earthwork loose and phenomenon.

基坑内设置临时汽车运输坡道,工程结算审核。斜道与基坑水平面成60°夹角,人行斜道供基坑作业时人员上下使用。对于pedestrian。人行斜道采用钢管搭设,路面工程施工。施工道路宽5m。沿各基坑周边设置人行斜道,word文档。

The gutteralong the pit when foundation pit construction on top setconstruction roads, construction road 5 m wide. Along each setaround the pedestrian chute, the pedestrian ramps for foundationpit homework personnel use the up and down. Pedestrian rampsset-up, the adoption steel pipe chute and foundation pit horizontalAngle 60 °, and set the anti-slip facilities. Constructionmachinery and equipment, turnover materials in advance.

各基坑施工时沿坑顶排水沟设置施工道路,中英文共计5万余字,全文中英文逐条对照, 5.3.3施工道路及清理Roadconstruction and clean up

部分章节示例:

九、保洁措施Cleaningmeasures

八、安全保证措施Eight safetymeasures

七、质量保证措施Seven, qualityassurance measures

6.2.7垫层浇捣Cast cushionlayer

6.2.6基坑排水Foundation pitdrainage

6.2.5基坑开挖施工的监测Excavation constructionmonitoring

6.2.4基坑周边荷载Around theload

6.2.3边坡稳定安全措施The slopestability safety measures

6.2.2挖土标高控制Diggingelevation control

6.2.1挖土方法Diggingmethod

6.2土方开挖Earthworkexcavation

6.1围护结构施工方案Constructionscheme of retaining structure

六、施工方法和技术措施Construction methods and technicalmeasures

5.3施工准备工作Constructionpreparation work

5.2施工策划ConstructionPlanning

5.1项目管理组织Projectmanagement organization

五、施工部署Construction ofthe deployment

方案选择SchemeSelection

1.3基坑概况Foundation DitchOverview:

1.2工程概况ProjectOverview:

1.1概述Summary

总目录TABLE OFCONTENTS

学术交流请致:matador1@

这份资料是典型的大型基坑和土方工程技术方案的范本, TECHNICAL SCHEME OF FOUNDATION DITCH AND EARTHWORKCONSTRUCTION